Facilities
PT Servo Lintas Raya (SLR) manages a 118 km special coal transportation route connecting coal mines in Lahat and Muara Enim to SDJ Port in Pali. The facility is designed for 24 hours / 7 days operation, equipped with bridges and supporting infrastructure, ensuring smooth, safe and sustainable coal transportation. The route is the main logistics backbone to support the coal supply chain in the region.
Hauling Road
SLR currently manages and operates a 118 km special coal transportation route, which connects the coal mines in Lahat and Muara Enim regencies to the PT Swarnadwipa Dermaga Jaya Port in Pali Regency.
This road is a dedicated all weather hauling roal, measured at 13 meters wide supported by 40 bridges and one underpass, ensuring seamless connectivity and structural integrity throughout the transportation corridor. It accommodates two 2×70 tons trailers going in the opposite direction, operating 24 x 7 nonstop, the road is traversed by more than 2500 trucks, boasting an impressive delivery capacity of approximately 50 million tons of coal annually, and provides a robust and dependable link to the region’s coal resources, ensuring that coal can be transported year-round.
The road crosses 52 villages, 11 sub-districts, and 3 regencies, serving as the only reliable logistical route for coal transportation in the area.
Intermediate Stockpile 107
Intermediate Stockpile 107: Spanning 65 hectares, with a capacity of 800,000 tons and is equipped with a 23,000 tons/day coal crusher.